← FOIA Repository

SSLCM Gap Analysis update for FRP 2 Oct 09

GENERAL REFERENCESEARCHABLEFOIA
2 pages · 410 KB
Released via Freedom of Information Act (5 U.S.C. § 552)
View PDFDownload

Tags

sslcmanalysisupdate

Document Preview

1 Life Cycle Planning - Develop availability Work Packages: - RMC develop work packages (PE and MT) - they do not consistently scrub the ICMP to ensure all required/due tasks are included - CSMP 2Ks are not scrubbed to match ICMP tasks when applicable, which prevents accurate return data collection - Funding limitations require that long term maintenance come second to operationally critical repair - Coordinate with TYCOM/NSA in scheduling maintenance to optimize operational availability - C
View full document →
The views and opinions presented in this document are those of the author and do not necessarily represent the views of the Department of Defense or any other U.S. Government agency. This document is reproduced as released by the originating agency under FOIA.
← Back to FOIA Repository·Terms·Privacy