← FOIA Repository

4 - Draft DDGRON FRP BRIEF 6 OCT09 v7

SHIP REPORTS / MISHAPSSEARCHABLEFOIA
39 pages · 5.7 MB
Released via Freedom of Information Act (5 U.S.C. § 552)
View PDFDownload

Tags

draftddgronbriefoct09

Document Preview

1 2 3 4 DATABASES: Maintain – MFOM / TRMS(TYCOM Readiness Management System) Sustain – CMP Continuous Monitoring Program (CMP), which extracts pulse point data from shipboard systems (R-Supply, SNAPII, Micro- SNAP, ROM II, and FSM) Man – COGNOS Train –ATG Extranet / Training Operational Readiness Information System (TORIS)/ 5 5 6 6 Notes: The goal of this graph is to compare the entire DDG Fleet with each other and determine the “Health” of the CLASSRON. Ships within 2 Standard deviations
View full document →
The views and opinions presented in this document are those of the author and do not necessarily represent the views of the Department of Defense or any other U.S. Government agency. This document is reproduced as released by the originating agency under FOIA.
← Back to FOIA Repository·Terms·Privacy