CNSL READINESS STANDARDS GUIDE GENERAL ELECTRICAL SYSTEMS CURRENT ISSUES SHORE POWER Issue: PMS and Shore Power Rigging/Unrigging (SPRU) are not being performed correctly, if at all. Currently CG, DDG, LSD, LPD 17 and PC Class ships DO NOT have PMS coverage for the shore power system. Inspections to be performed under SPRU are not performed correctly and deficiencies aren’t corrected.