← FOIA Repository

INSURV - CO Big Picture Preps Aug 2007

INVESTIGATIONS / IGSEARCHABLEFOIA
2 pages · 0 KB
Released via Freedom of Information Act (5 U.S.C. § 552)
View PDFDownload

Tags

insurvpicturepreps2007

Document Preview

CO’s Big Picture “Gouge” for INSURV Material Inspections - When INSURV Inspection team arrives, expectation is that ship is ready to conduct prompt, sustained combat operations at sea. - Start preparing for INSURV at least 6 months ahead of time: -- Personally read and study INSURVINST 4730.1C - the specific expectations are all here. -- Ensure PMS routinely done. QA. -- Have senior, knowledgeable personnel conduct routine zone inspections. Ensure zone inspectors are tra
View full document →
The views and opinions presented in this document are those of the author and do not necessarily represent the views of the Department of Defense or any other U.S. Government agency. This document is reproduced as released by the originating agency under FOIA.
← Back to FOIA Repository·Terms·Privacy